
Assignment
Norconsult has in the different project phases for the two buildings and pump station also assisted Aibel within technical safety design, including fire safety, and has worked together as one team with technical safety personnel in Aibel, during FEED and detail engineering phases for the two projects. Phase 1 including pump station is already in operation. The project is still ongoing for phase 2 converter building.
Solution
The project was carried out according to Equinor`s contract documents.
Vidar Tangen
Seniorrådgiver
Contact us
